Irkutsk
This project was realized in the water treatment unit of Shelekhov Segment of Novo-Irkutsk Thermal Power Station (former Irkutsk Thermal Power Station-5), Russia.
Home > Automation > Water Treatment > Irkutsk
One of the main requirements of this assignment was providing a working capacity of the water production unit to its fullest extent in case of a possible failure of any part of water treatment system or any automatization component, because any water closure in the Thermal Power Plant would create an emergency stop, that is inadmissible during winter period of the northern region. Another important requirement was a visualization of information received by operators, as well as an easy-to-use and accessible operation control.
The created system of automation allows to control the ultrafiltration devices in automatic, semiautomatic and testing modes; the reverse osmosis units in automatic and semiautomatic mode; make automatic testing of membrane integrity, make standard purification and inform about the necessary intensive purification of each ultrafiltration unit; it can provide rotation of the units and, correspondingly, an uniform wear and tear.